City
Epaper

1-km long bicycle track at Seven Hills

By Lokmat English Desk | Updated: February 4, 2022 22:05 IST

Aurangabad, Feb 4:The Aurangabad Smart City Development Corporation Limited (ASCDCL) has geared up to establish a second bicycle ...

Open in App

Aurangabad, Feb 4:

The Aurangabad Smart City Development Corporation Limited (ASCDCL) has geared up to establish a second bicycle track in the city after Kranti Chowk. The 1-km long new track will be extended from Seven Hills to the old Central Octroi Checkpost. ASCDCL claimed that the track space will also be a safe way for pedestrians.

The main aim of developing tracks is to control the growing pollution in the city and encourage citizens to ride bicycles or enjoy walking. ASCDCL will also beautify the route. The track and route have been designed by experts and there will be displays of instruction boards at various points to guide the track-users.

Tags: Aurangabad Smart City Development Corporation LimitedASCDCL
Open in App

Related Stories

AurangabadDemand for 300 smart buses in city?

AurangabadSmart City DyCEO Saurabh Joshi transferred as addl civic chief

AurangabadSmart City CEO pin-points need of using technology; boost income sources

AurangabadSmart City gets extension till June 2024

AurangabadWork or face music: Smart City CEO

Aurangabad Realted Stories

AurangabadBJP focuses on building social harmony

AurangabadYoung woman robbed again in Same Area

AurangabadAvoid wild comments on ‘toxic parenting’

AurangabadMumbai-Nagpur high-speed rail project stalls as land acquisition office shut down

AurangabadUDD issues notification of approved City Development Plan