City
Epaper

3-hours power shutdown by MSEDCL affects city water supply

By Lokmat English Desk | Updated: November 15, 2024 21:40 IST

Chhatrapati Sambhajinagar:A power transformer supplying electricity to the 700 mm diameter water pipeline providing water to the city ...

Open in App

Chhatrapati Sambhajinagar:

A power transformer supplying electricity to the 700 mm diameter water pipeline providing water to the city malfunctioned, leading to a 3-hour shutdown by Mahavitaran (or MSEDCL) on Friday. Meanwhile, the municipal corporation has alerted that the city's water supply will be affected due to the incident.

The issue occurred with the transformer on the old water supply scheme at Jayakwadi. On learning the need to replace the cables, the MSEDCL scheduled a shutdown from 3 pm to 6 pm to carry out the necessary work. During this 3-hour period, the water pumping from the 700 mm diameter pipeline was stopped. As a result, water supply to the old city area, as well as the Cidco-Hudco regions, was expected to be under low pressure, said the CSMC water supply officials.

Open in App

Related Stories

CricketPBKS' Prabhsimran Singh completes 1,000 runs in the IPL

AurangabadAgitation will not step back until compensation is paid off: MLC Danve

NationalRJD to hold conferences in all 243 Bihar Assembly constituencies: Tejashwi Yadav

CricketKKR vs PBKS: What Happens if Kolkata Knight Riders vs Punjab Kings IPL 2025 Match Gets Washed Out Due to Rain? EXPLAINED

Other SportsKapil Dev Grant Thornton Invitational: Angad Cheema dominates final round with 66 to win

Aurangabad Realted Stories

AurangabadTender invited to protect JSW land through barbed wire fencing

AurangabadOld law curriculum students' plea for 2025 exam rejected

AurangabadCivic Chief inspects Kham River; operates poclain

AurangabadCSMC calls for all-party meeting to avoid defacing city's beauty

AurangabadPolitical dispute leads to caste-based abuse against female office bearer