City
Epaper

300-mm size pipeline bursts near Gajanan Maharaj temple

By Lokmat English Desk | Updated: May 17, 2023 22:50 IST

Chhatrapati Sambhajinagar:Thousands of litres of water got wasted after a 300 mm size pipeline got damaged in an ...

Open in App

Chhatrapati Sambhajinagar:

Thousands of litres of water got wasted after a 300 mm size pipeline got damaged in an area opposite Gajanan Maharaj temple on Wednesday at 8 am.

The water supply officials took almost eight hours to repair the damage. Till then the water supply in Ulkanagari and surrounding areas got disrupted due to the snag.

It is believed that the pipeline was very old, therefore, it got burst. Acting upon the information, the municipal corporation’s deputy engineer Mahesh Chaudhary and junior engineer Sushil Kulkarni stopped the water supply. Later on, a JCB was pressed to dig a pit beneath the pipeline to undertake its repair. The water supply was restored in the evening, but the areas like Ulkanagari, August Home, Nilgiri Parisar, Khinvsara Fort and surrounding localities witnessed disruption in water supply, said the water supply officers.

Tags: Jcb IndiaJCBMahesh chaudharyJcb machineJcb literature foundationSushil KulkarniJcb prize for literatureJcb tractor factoryAsso VP corp Rel JCB India LtdJcb industries
Open in App

Related Stories

NationalWaqf Amendment Bill: AIMPLB to Launch Nationwide Protests If Bill Passed in Parliament

MumbaiMumbai: 55-Year-Old Man Sleeping on Roadside in Vile Parle Crushed to Death by JCB; Driver Flees

NationalMeerut: 168-Year-Old Mosque Demolished Near Jagdish Mandap on Delhi Road with Mutual Consent

NationalTamil Nadu Horror: JCB Operator Dies as Iconic Madurai Arch Collapses During Demolition; Video Emerges

NationalJCB Operator Rescued After 7-Hour Struggle in Uttarkashi After Vehicle Overturns (Watch Video)

Aurangabad Realted Stories

AurangabadBJP focuses on building social harmony

AurangabadYoung woman robbed again in Same Area

AurangabadAvoid wild comments on ‘toxic parenting’

AurangabadMumbai-Nagpur high-speed rail project stalls as land acquisition office shut down

AurangabadUDD issues notification of approved City Development Plan