City
Epaper

Aurangabad 'Mission Green Mobility' launched

By Lokmat English Desk | Updated: January 28, 2022 19:05 IST

Purchase of 1000 two wheeler, 250 four wheeler, 50 buses and 500 three wheelerAurangabad, Jan 28:To encourage ...

Open in App

Purchase of 1000 two wheeler, 250 four wheeler, 50 buses and 500 three wheeler

Aurangabad, Jan 28:

To encourage and promote the Electric Vehicle (EV) ecosystem in the city and the region, the Marathwada Auto Cluster (MAC), with the support of citizens and industrial organizations, has launched 'Aurangabad Mission Green Mobility' an initiative to reduce air pollution through green mobility.

Giving more information. MAC chairman Munish Sharma said,"This initiative will help Aurangabad become an electric driven vehicle hub. As a part of the initiative, 1000 two wheeler, 250 four wheeler, 50 buses and 500 EV three wheeler are targeted to be brought in the city and region. Considering the required ecosystem to the new technologies, development with more than 20 charging stations at public places with easy access is also planned. The mission was launched with the resolution to purchase 250 EVs in the first phase. The process of purchasing these EVs is likely to be completed by March 2022". This initiative of the mission is to lower emission to give our next generation CLEAN Water-Air-Soil (WAS), said MAC director Ashish Garde and Prasad Kokil.

Benefits of joining the initiative

The members pointed out that there are only three EV dealers for four wheeler in the state and only one in Aurangabad. The benefit for a single buyer is not so significant. However, a large order might attract large benefits like increased subsidy, lower waiting period, low price, interest rates and exemption on processing fees. Hence those who want to enroll for the initiative can register themselves on https://tinyurl.com/EV-Enquiry.

Subsidy of more than two lakh

The members said that the government has offered a subsidy of 2.3-2.5 lakh behind EV ranging up to Rs 15 lakh. However, there is no subsidy for vehicles above Rs 15 lakh.

Chip shortage hampers production

The chip shortage has hampered the production of the EVs. The waiting period stretches up to six months. To tackle the problem, the Central government has offered a subsidy of 4 billion dollars for manufacturing these chips in India, said Kokil.

Tags: AurangabadindiaMarathwada Auto Cluster`Aurangabad Mission Green MobilityMunish sharmaAshish gardeMAC
Open in App

Related Stories

MaharashtraOver 10,000 Pakistani Nationals Traced in Maharashtra and Delhi Post-Palgham Terror Attack

MumbaiViral Sighting of Tesla Cybertruck Near Mumbai Stirs EV Enthusiasm (Photos)

MaharashtraChhatrapati Sambhajinagar Water Supply at Risk as CSMC Fails to Clear Rs 10 Crore Bill

NationalPM Narendra Modi Discusses Tech and Innovation Collaboration With Elon Musk

NationalTahawwur Rana Extradition: Pakistan Distances Itself From 26/11 Accused After Arrival in India

Aurangabad Realted Stories

AurangabadChhattisgarh woman ends life at relative's house; case registered

AurangabadMurtizapur cylinder Blast: Woman succumbs to injuries

AurangabadOnline registration for TAIT-2025 commenced

AurangabadWhat is TrueBeam and how will citizens benefit?

AurangabadGovernment boosts cancer care and medical education