City
Epaper

Mumbai Metro's first 'Driverless' train to arrive on Jan 27

By IANS | Updated: January 20, 2021 21:25 IST

Mumbai, Jan 20 Mumbai Metro will get its first of its indigenously-manufactured driverless trains from Bharat Earth Movers ...

Open in App

Mumbai, Jan 20 Mumbai Metro will get its first of its indigenously-manufactured driverless trains from Bharat Earth Movers Ltd. Bengaluru, Urban Development Minister Eknath Shinde said here on Wednesday.

The first of these automatic Metro trains will reach the Charkop Metro Carshed in Mumbai on January 27 and after operational tests, will be deployed on the two new Metro routes scheduled to start from May this year, he said.

"This will be a driverless Metro train, running automatically. But, in order not to panic or make passengers feel unsafe, for around six months initially, they will be operated by a motorman. The trains will have a max speed limit of 80kmph," said Shinde.

The new driverless trains will be run on Metro 2A Dahisar to DN Nagar and Metro 7 Dahisar to Andheri East, a full seven years after the country's commercial capital got its first 11-km long Metro on the Versova-Andheri-Ghatkopar sector.

Shinde said that under the guidance of Chief Minister Uddhav Thackeray, the construction of these Metro lines and stations are accelerated, and being executed by Mumbai Metropolitan Region Development Authority (MMRDA) is in the final stages.

The BEML will manufacture around 390 coaches, comprising 65 rakes of 6 coaches each for the proposed 340-km long Mumbai Metro network, at cost of Rs 3,015 crore - which are around 20 percent more economical than those manufactured internationally.

Each coach will seat 52 passengers and the capacity of each train is around 2,280 passengers, and while 6 rakes will be delivered in next six months, the rest shall follow over the coming three years.

During his visit to the Bengaluru site, Shinde along with MMRDA's Director of Systems Rajiv Agarwal met BEML CMD Dr D.K. Hota and other top officials.

Shinde also reviewed the latest world-class technology and measures taken for passenger safety and security as well as the amenities offered in each train.

The trains have state-of-the-art technology like VVVF, Train Control and Management System for speed control and safety, optical fibre in each coach for Internet, and the coaches are designed to conserve energy and switch to alternative non-conventional energy in case of a power outage.

All trains are air-conditioned with automatic doors, passenger announcement and information system, anti-skid floor to prevent slipping, fire-fighting, CCTVs in train and on platforms, an emergency help button, etc.

In September 2019, Prime Minister Narendra Modi had inaugurated the first coach of the Mumbai Metro under the 'Make In India' initiative.

( With inputs from IANS )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: MetronidazoleBharat earth movers ltd.mumbaiUddhav ThackerayMumbai MetroEknath ShindeUddhav fadnavisMetro.co.uk
Open in App

Related Stories

NashikSimhastha Authority to Be Established in Nashik: Eknath Shinde Unveils Plans in Mumbai Meeting

MumbaiIqbal Kaskar, Dawood Ibrahim’s Brother, Acquitted in 2017 Thane Extortion Case by Mumbai Court

MumbaiMumbai’s Iconic Elphinstone Bridge Closure Postponed Till Monday After Citizens Protest

MaharashtraMaharashtra Weather Update: Mumbai Temperature Stable, Mixed Weather Across State For Next Four to Five Days

MaharashtraPahalgam Terror Attack: Eknath Shinde Offers Rs 5 Lakh Aid to Family of Syed Adil Hussain Shah Who Died Protecting Tourists

Business Realted Stories

BusinessMillions benefited from Ayushman health cards, now is the time for Delhi: Hardeep Puri

BusinessViksit Bharat will be driven by start-ups and innovation: IIT Madras Director

BusinessIndia sees robust 10.35 pc annual growth in domestic airline passengers in FY25

BusinessSwiggi Instamart to create dedicated 'cooperative' category on its platform, signs MoU

BusinessIDFC FIRST Bank posts nearly 60 pc net profit loss at Rs 295.6 crore in Q4 FY25