City
Epaper

Bullet Train project: JICA gives 3rd tranche of Rs 6K-crore loan

By IANS | Updated: July 25, 2022 19:05 IST

Mumbai, July 25 The Japan International Cooperation Agency (JICA) has decided to give the third tranche of Rs ...

Open in App

Mumbai, July 25 The Japan International Cooperation Agency (JICA) has decided to give the third tranche of Rs 6,000-crore for the upcoming Ahmedabad-Mumbai High Speed Rail, or the Bullet Train project, an official said here on Monday.

The Official Development Assistance (ODA) agreement of Japanese Yen (JPY) 100,000-million (@ Rs 6,000 crore) was signed between JICA India Senior Representative Watanabe Jun and Ministry of Finance Additional Secretary R.K. Mishra.

The project aims to develop a high-frequency mass transportation system by building the high speed rail between Ahmedabad and Mumbai, using Japan's Shinkansen technology or 'Bullet Train' and enhancing mobility in the country for regional economic development.

Jun said that the project has become a symbol of India-Japan collaboration with Japan introducing its high speed rail technology for India's first such initiative, slated to cost around Rs 1.08 lakh crore, with over 80 per cent funding through loan from JICA.

"We have witnessed great progress in the civil works so far. The day is approaching when the Shinkansen System developed in the project will contribute to region-wide economic and social development to generate incomes for local residents," Jun remarked.

Besides simplifying mobility and ease of connectivity with a safe and reliable inter-city transport system, the collaboration will ensure technology transfer to boost the Make in India drive.

Earlier, in 2017, the JICA had provided around JPY 250,000-million (@ Rs 18,000 crore) for the 508 kms long project being implemented by National High Speed Rail Corporation Ltd.

The pet initiative of Prime Minister Narendra Modi, the Bullet Train project was scheduled to be completed by 2022-end, but has been plagued by delays in both Gujarat and Maharashtra and may be only partially operational by 2028.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Jun WatanabeindiamumbaiJapan International Cooperation AgencyNarendra ModiIndiUk-indiaOdaRepublic of indiaIndia indiaNarendra modi modi
Open in App

Related Stories

ThaneThane Traffic Update: Ghodbunder Road Repairs to Disrupt Vehicular Movement From April 26 To 29

National‘Question Kunal Kamra In Chennai’: Bombay HC To Police; Grants Protection From Arrest

MumbaiViral Sighting of Tesla Cybertruck Near Mumbai Stirs EV Enthusiasm (Photos)

MumbaiMumbai 1 App Likely To Launch On May 1

ThaneThane: Fire Breaks Out in Scrap Warehouse in Bhiwandi, Damage Estimated in Millions (Watch Video)

Maharashtra Realted Stories

MaharashtraPahalgam Terror Attack: 3rd Flight Carrying 232 Tourists Lands in Maharashtra, 800 Tourists Returned Safely So Far

PuneGBS Scare in Pune: 15-Year-Old Baramati Boy Admitted to ICU With Suspected Guillain-Barré Syndrome

MumbaiMumbai: Man Dies by Suicide at Mahim Railway Station; Probe On

MumbaiMumbai: Man Arrested for Allegedly Killing Sister Over Property Dispute in Juhu

ThaneSex Racket Busted in Thane: Three Arrested for Operating Flesh Trade From Spa on Ghodbunder Road