City
Epaper

Metro Line-9 phase one likely to be operational by next year

By Lokmat English Desk | Updated: February 25, 2023 11:24 IST

The Mumbai Metropolitan Region Development Authority (MMRDA) is likely to make the phase one of Metro Line-9 corridor operational ...

Open in App

The Mumbai Metropolitan Region Development Authority (MMRDA) is likely to make the phase one of Metro Line-9 corridor operational by next year. The MMRDA said that 63.63% works of the Meditiya Nagar station is completed. One of the tallest on the Metro-9, the station will be three-tier—a flyover for vehicles on tier one, a concourse on tier two and a platform on tier three. The total height of the station will be 35 metres from road level.

This 10.58-km-long route will not only connect Mumbai with Mira-Bhayandar, but will also reduce congestion at Dahisar toll naka—a vital entry point to the city. The project will be completed in two phases—Dahisar (E) to Kashigaon in the first phase and further ahead till Subhash Chandra Bose Stadium in the second phase. Sources also said there is a possibility of the line being further extended by 1.5-2 km till Uttan where an alternative land is being scouted for a car shed.

“Even if we start the first phase of the route starting from Kashigaon, it will help scores of people as the line connects to Metro Line-7 at Dahisar (E),” an MMRDA official said. Sources said that initially they would require 3 to 4 rakes to open the first phase of the line. The deadline for the entire corridor is December 2025. Locals said that the part opening of the Metro-9 corridor will also benefit people. “Mira Road and Kashimira residents will certainly get benefits as they can travel all the way till Andheri (E) or (W) using the existing Metro lines 7 and 2A. Getting out of the Dahisar check naka is agonising for any motorist,” G Zaveri, a resident of Kashimira, who currently uses the suburban local train, said. This metro line will have two interchange metro stations—first at Dahisar (E) with an interchange for Gundavali to Dahisar (E) on Metro-7 and Andheri (W) to Dahisar (E) on Metro-2A. Second interchange is at Miragaon metro station with Metro Line-10 (Gaimukh to Shivaji Chowk). This is estimated to reduce the current travel time by 50-75% depending on road conditions.

Tags: MetronidazoleMumbai NewsMaharashtra News
Open in App

Related Stories

MumbaiMumbai Water Metro: Kochi Metro Joins Hands for City's Waterway Upgrade

MumbaiMumbai: Protest Against Pahalgam Attack Turns Violent in Vakola, Leaving Young Boy Seriously Injured (Watch Video)

MaharashtraMaharashtra Honor Killing Horror: Retired PSI Guns Down Daughter in a Wedding Ceremony At Chopda

MumbaiMumbai Fire: Major Blaze Erupts at ED Office in South Mumbai’s Ballard Estate; No Casualties Reported

MumbaiMumbai: BTech Student Among Three Held for Duping Trader of Rs 15 Lakh

Maharashtra Realted Stories

Navi MumbaiNavi Mumbai: Woman Allegedly Kills 6-Year-Old Daughter, Dies by Suicide in Ghansoli

MumbaiMumbai Accident: Delivery Boy Killed After Being Hit by BEST Bus in Prabhadevi

Mumbai26/11 Mumbai Attacks: Tahawwur Hussain Rana Denies Role During Crime Branch Interrogation

NashikNashik: 20-Year-Old Woman Killed in Leopard Attack in Dindori Taluka

NashikSimhastha Authority to Be Established in Nashik: Eknath Shinde Unveils Plans in Mumbai Meeting