City
Epaper

Thane Traffic Update: Police Issue Advisory for Metro’s U-Girder Installation Work on Ghodbunder Road; Check Timing and Diversion Route

By Nirmeeti Patole | Updated: March 27, 2024 12:34 IST

Traffic changes have been implemented by the Thane Traffic Police due to ongoing work by Reliance Astaldi Company to ...

Open in App

Traffic changes have been implemented by the Thane Traffic Police due to ongoing work by Reliance Astaldi Company to place U-girders between Tatvadnyan Vidyapeeth and Wagbil Bridge, which falls under MMRDA jurisdiction. The entry for vehicles traveling from Thane to Ghodbunder Road via Wagbil Bridge will be closed from 11:55 pm on March 26 to 4 am on March 27, and again from 11:55 pm on March 31 to 4 am on April 1. 

An alternative route has been designated for vehicles heading in this direction. Drivers will need to make a turn before ascending the bridge and proceed in the opposite direction, then take a cut from the Panchamrut bus stop to reach their destination via the main road.

Due to the ongoing construction of the metro line on Ghodbunder Road, the Thane Traffic Police have implemented traffic changes on this road. An important phase of this line is currently underway in the Ghodbunder area. As part of this work, girders will be erected on the metro pillars in the Waghbil area. 

“It is necessary to close the Wagbil Bridge for traffic from Thane to Ghodbunder Road to avoid traffic congestion and ensure smooth and safe traffic in the area for the convenience of the public,” they said in its press release. They have appealed to motorists to follow the traffic rules and cooperate with the police.

The above traffic advisory will be in force until the work of placing the U-girders is completed during the aforementioned period. This traffic control notification will not apply to police vehicles, fire brigade, ambulances, green corridor, oxygen gas vehicles and other emergency service vehicles.

  • Closure of entry for all vehicles heading towards Ghodbunder on Wagbil Bridge during the placement of U-girders.

Alternative routes provided:

  •  Heavy vehicles diverted through a cut before Wagbil Bridge climb to the opposite direction, leading to the main road via a cut near Panchamrut bus stop.
  • Vehicles from Ghodbunder to Thane directed via the slip road of Wagbil Bridge.

Closure dates and timings:

  • From 11:55 pm on 26/03/2024 to 4:00 am on 27/03/2024.
  • From 11:55 pm on 31/03/2024 to 4:00 am on 01/04/2024.
Tags: Thane Traffic UpdateMumbai NewsGhodbunder RoadThane Traffic Police
Open in App

Related Stories

MumbaiMumbai Police on High Alert After Deadly Terror Attack in Pahalgam

MumbaiMumbai Customs Arrests Chennai Man for Smuggling Hydroponic Weed Worth Rs 90 Lakh in Trolley Bag

MumbaiMumbai: Married Woman Murdered by Lover in Vikroli, Accused Arrested Within 8 Hours

MaharashtraHindi No Longer Compulsory in Maharashtra, Govt Backs Down on Language Mandate for Classes 1 to 5

MumbaiMumbai Shocker: Police Arrests Truck Driver for Raping Stepdaughter, Murdering Wife in Dharavi After 21 Years

Maharashtra Realted Stories

ThaneAmbernath Firing: Two Men Open Fire at Builder's Residence in Thane; CCTV Footage Surfaces (VIDEO)

MumbaiTiger Shroff Death Threat: Mumbai Police Arrest Man from Punjab for Threatening Bollywood Actor

MumbaiVile Parle Jain Temple demolition: Maharashtra Minority Commission Slams BMC For Bulldozing The Shrine

PunePune Road Rage: Couple Beaten with Sticks and Stones, Car Vandalised After Dispute Over Honking

ThaneThane Crime Branch Nabs Wanted Sex Racket Accused from Ambivli Village