City
Epaper

Centre approves Rs 9,599 crore to maintain National Highways in FY25

By IANS | Updated: March 27, 2025 16:36 IST

New Delhi, March 27 To maintain the vast National Highway (NH) network, the government has approved short-term maintenance ...

Open in App

New Delhi, March 27 To maintain the vast National Highway (NH) network, the government has approved short-term maintenance contract (STMC) works in 17,884 km length, costing Rs 2,842 crore, and performance-based maintenance contract (PBMC) works in 6,118 km length, costing Rs 6,757 crore, in the current fiscal (FY25), Union Minister of Road Transport and Highways, Nitin Gadkari, said on Thursday.

In a written statement in the Lok Sabha, the Union Minister said the government has prioritised the maintenance of the existing NH network and has evolved a mechanism to ensure the maintenance and repair of all NH sections through an accountable maintenance agency.

At present, 1,310 NH projects in 31,187 km length costing Rs 8.11 lakh crore are under construction in the country.

While STMC works are generally undertaken for a contract period of 1-2 years, PBMC works are undertaken for a contract period of about 5-7 years.

The government encourages the adoption of innovative technologies or methods to enhance the durability and reduce the maintenance requirements of NHs (depending upon factors like rainfall, terrain type, soil category, etc.).

Road condition assessment is carried out through Network Survey Vehicle (NSV) for the NH stretches before the start of work, before the issue of the completion certificate and thereafter at regular intervals of six months after completion of the work, thereby enabling quality assessment of NHs at regular intervals, the minister said.

Additionally, the government has taken up the installation of the Advanced Traffic Management System (ATMS) on four-lane and above NHs.

"ATMS has provisions for various electronic enforcement devices which help in the speedy identification of incidents (including traffic violations) on the highway stretches and effectively monitor the highways, thereby improving incident response time and road safety,” said Gadkari.

Road safety engineering measures and works on NHs, including rectification of blackspots.

Out of the total 13,795 black spots identified on the NHs up to 2021-22, short-term rectification measures have been completed on 11,515 black spots, and permanent rectification measures have been completed on 5,036 black spots, the government said.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

InternationalPresident Droupadi Murmu departs for Vatican City to attend state funeral of Pope Francis

NationalPresident Droupadi Murmu departs for Vatican City to attend state funeral of Pope Francis

ThaneThane: Fire Breaks Out in Scrap Warehouse in Bhiwandi, Damage Estimated in Millions (Watch Video)

National“Battle Is Between Good and Evil Not Communities”: RSS Chief Mohan Bhagwat on the Pahalgam Terror Attack (Watch Video)

NationalRahul Gandhi to visit J&K today after Pahalgam terror attack

National Realted Stories

National'I will say nothing more': US spokesperson shuns Pak journalist's question over Pahalgam attack

NationalTourists who return to Mumbai thank Centre, Maharashtra govt after Pahalgam terror attack

NationalPresident Droupadi Murmu to visit Vatican City for Pope Francis's funeral

NationalHelipad to be built at city bus terminal in Gurugram

NationalInfant dies after accidentally drinking chemical in Gurugram village